Conveyor systems from Stoiber GmbH
The parts are picked up with electronic lifting gear and positioned at the optimal working height. They are then transported on a continuous rail system through the washing, painting and drying cabins from the steel construction hall directly into the assembly hall. Finally, the electronic lifting gear is moved back into the parking position by the conveyor system and made available for the next cycle.